Thursday, August 11, 2016
Couple of updates
At this point of the build, the updates are going to be slower. The builder is waiting for the meters to be installed to finish the interior work. We should see the landscaping being installed soon. They installed the garage doors. They, along with the shutters, will be stained a dark brown. They also installed the kitchen backsplash and sprinkler system. One cool part of the sprinkler system is the use of soaker tubes in the flower bed and along the sidewalk. Here are a couple of photos.